ESP Timber - End Seal Preservative - Clear

ESP Timber - End Seal Preservative in Clear (1 Litre)

£16.98
In Stock
£16.98
Adding to basket... The item has been added

Description

Water-based end grain timber preservative for the retreatment of cut or bored pressure treated timber. A brush on protection where no topcoat is required. Fungicide specifically formulated for use against wood rotting fungi and Algae, Lichen, mould & other growths on hard surfaces. Can treat cut bare wood to Use Class 2 and UC3.

When cross cutting, notching or boring treated timber products during installation, ALWAYS apply an end grain preservative treatment to freshly exposed areas – to maintain the integrity of the protection. All site cuts of pressure treated timber are required under building regulations to be re-treated.

Ideal for:
• All cut ends of pressure treated timbers
• Decking boards & joists
• Fence posts
• Top rails
• Gravel boards

Features:
• Easy application: Brush or spray applied
• Tried and tested formula
• Water based
• Metal free
• Available in three colours; Green, Brown & Clear
• Cleared for use by both professional and non-professional use by the HSE
• Reseals ‘tanalised’, pressure treated, or Vac-Vac pressure treated timbers to UC2, UC3 or UC4

Coverage:
1 litre treats 5m² of timber ~ that’s 700 50x100 deck joists!!

Advice:
Liberally brush apply the ESP Timber to any cuts, notches and drilled areas exposed on the treated timbers revealed during use or installation to maintain the integrity of the preservative protection.

Care should always be taken when applying ESP Timber product to cut ends and notches, that any overlap onto a treated timber face that is going to be exposed and seen as a natural face, should be wiped off to prevent uneven weathering. Treated timbers going into ground contact Use Class 4 situations should not be cut at the ground contact end of the component.

Application:
Apply by brush or low-pressure sprayer.
Apply at 200ml/m² (1L per 5m²).
Product may require 2-3 coats to achieve required finish/loading, depending on porosity of surface.
Drying Time:
Touch dry within 2 hours depending on drying conditions and humidity.

Reviews

Write a Review
(No reviews yet)

Share this product

You Might Also Like